Edgar Leitner
CEO
e.leitner@bwb.bz.it
T +39 335 6425008 +43 699 12221702
Compelling references
An insight into BWB Ingenieurbüro’s work
You can find our team’s most compelling reference projects here. Be inspired and impressed – by the extensive expertise and many years of experience in planning, construction and construction operations.
References
Geotechnical engineering & tunnelling
Water & the environment
Transport & infrastructures
Civil engineering
Project
Work
Year
Brenner Base Tunnel section E51 – Wolf 1 exploration section in Steinach am Brenner (A)
Client: Brenner Base Tunnel BBT SE
Client: Brenner Base Tunnel BBT SE
Construction supervision
2010


Brenner Base Tunnel section E52 – Wolf 2 exploration section in Steinach am Brenner (A)
Client: Brenner Base Tunnel BBT SE
Client: Brenner Base Tunnel BBT SE
Construction supervision
2011





Brenner Base Tunnel section H33 – Tulfes-Pfons main section
Client: Brenner Base Tunnel BBT SE
Client: Brenner Base Tunnel BBT SE
Construction supervision
2015






Brenner Base Tunnel section V41 – Ahrental ventilation cavern and Patsch shaft
Client: M+G Ingenieure, Dipl.-Ing. Josef Galehr, Ziviltechniker GmbH
Client: M+G Ingenieure, Dipl.-Ing. Josef Galehr, Ziviltechniker GmbH
Planning
2012



Improvement of the Val Pusteria/Pustertal road – new entrance to Val Badia/Gadertal with Rienza/Rienz bridge & Flarónz/Pflaurenz tunnel, “Klosterwald” construction section
Client: Karl Pichler Engineers
Client: Karl Pichler Engineers
Planning
2012


Brenner Base Tunnel section V41 – Ahrental ventilation cavern variant
Client: Brenner Base Tunnel BBT SE
Client: Brenner Base Tunnel BBT SE
Planning
2014

Brenner Base Tunnel cost calculation
Client: Brenner Base Tunnel BBT SE
Client: Brenner Base Tunnel BBT SE
Planning

Padastertal hydraulic structures Brenner Base Tunnel section E51 – Wolf 1 exploration section in Steinach am Brenner (A)
Client: Brenner Base Tunnel BBT SE
Client: Brenner Base Tunnel BBT SE
Planning, construction supervision
2012


Padastertal hydraulic structures Brenner Base Tunnel section E52 – Wolf 2 exploration section in Steinach am Brenner (A)
Client: Brenner Base Tunnel BBT SE
Client: Brenner Base Tunnel BBT SE
Planning, construction supervision
2012


Fish ponds with Tyrol Weir system Brenner Base Tunnel section E52 – Wolf 2 exploration section in Steinach am Brenner (A)
Client: Brenner Base Tunnel BBT SE
Client: Brenner Base Tunnel BBT SE
Planning, construction supervision
2012



Water protection system Brenner Base Tunnel section E52 – Wolf 2 exploration section in Steinach am Brenner (A)
Client: Brenner Base Tunnel BBT SE
Client: Brenner Base Tunnel BBT SE
Planning, construction supervision
2012



Rock stabilisation in the Unterblabacherhof area
Client: Villandro/Villanders municipality
Client: Villandro/Villanders municipality
Planning, construction supervision, safety
2013






Pfitsch replacement water supply
Client: Brenner Base Tunnel BBT SE
Client: Brenner Base Tunnel BBT SE
Planning
2013


Widening of the Plataristraße road with cycle path and railway underpass in Villabassa/Niederdorf
Client: Villabassa/Niederdorf municipality
Client: Villabassa/Niederdorf municipality
Planning
2012

Laying of cycle path and wooden bridge in the Rammlwand/Landmannfeld area in Vandoies di Sotto/Niedervintl
Client: Vandoies/Vintl municipality
Client: Vandoies/Vintl municipality
Planning, construction supervision, safety
2012





Renovation and new construction of the Valles/Vals main collector: Badwirt-Koara section
Client: Mühlbach municipality
Client: Mühlbach municipality
Planning, construction supervision, safety
2012




Klinger expansion zone, Bressanone/Brixen
Client: Bressanone/Brixen municipality
Client: Bressanone/Brixen municipality
Planning, construction supervision, safety
2016



Lower check dam Brenner Base Tunnel section E51 – Wolf 1 exploration section in Steinach am Brenner (A)
Client: Brenner Base Tunnel BBT SE
Client: Brenner Base Tunnel BBT SE
Planning, construction supervision
2012


Upper check dam Brenner Base Tunnel section E52 – Wolf 2 exploration section in Steinach am Brenner (A)
Client: Brenner Base Tunnel BBT SE
Client: Brenner Base Tunnel BBT SE
Planning, construction supervision
2012








Intake structure Brenner Base Tunnel section E52 – Wolf 2 exploration section in Steinach am Brenner (A)
Client: Brenner Base Tunnel BBT SE
Client: Brenner Base Tunnel BBT SE
Planning, construction supervision
2012



Construction of the MIRA housing complex
Client: Hego Bau GmbH
Client: Hego Bau GmbH
Structural planning, structural construction supervision
2010



Bridge over the Eggerbach between Novàle basso/Niederried and Fúldres/Pfulters
Client: Campo di Trens/Freienfeld municipality
Client: Campo di Trens/Freienfeld municipality
Planning, construction supervision, safety
2011

The Team




